Real Results.
Proven Impact.
From lagoons to municipal plants, see how our solutions deliver measurable improvements in performance, efficiency, and cost savings.
Lagoons and stabilization ponds
City of Mapleton, North Dakota
Primary pond, 5.4 tested acres. Surveyed June 2021 and again April 2026.
Results
- Average sludge depth down from 19.68 inches to 11.64 inches
- Sludge volume down 57.05 percent, from 2,921,199 gallons to 1,254,430 gallons
- 1,189,000 gallons of usable pond storage recovered
- Roughly $183,000 avoided in mechanical sludge removal, based on $0.11 per gallon
- 336,528 sonar data points collected on the 2026 survey
Mechanical and activated sludge plants
City of Wadena, Minnesota
Activated sludge plant, average daily flow 500,000 gallons. T197 Mega Bugs HC added at the head of the aeration basin.
Results
- Biosolids down 45,500 gallons year on year, a 6 percent reduction
- Dry tons down 15 percent, from 74 to 64
- Better cold weather operation
- The plant responded better to higher than normal spike flows and to slug BOD loading
- Biosolids fell in the same year the city began phosphorus reduction, which normally raises biosolids production by 30 to 60 percent
Source document: City of Wadena case study (PDF, 124 KB)
Roads and base stabilization
St. Croix County, Wisconsin
CTH G and CTH Z, 4.3 miles combined, both built over poor quality sand lift base. Tested by American Engineering Testing.
Results
- Resilient modulus 79,000 to 101,000 psi against a 30,000 psi reference value
- Layer coefficient 0.19 to 0.21
- Equivalency factors of 1.4 against crushed aggregate and 1.9 against crushed gravel
Base testing on other projects, measured and signed by American Engineering Testing:
Source documents
Original program documents from additional wastewater sites.
Lagoons and stabilization ponds
- City of Sebeka case study (PDF, 133 KB)
- City of Belgrade sludge reduction program (PDF, 161 KB)
- City of Baudette trial sludge reduction program (PDF, 109 KB)
- City of Oslo sludge judge comparison (PDF, 155 KB)
- City of Loretto sludge reduction program (PDF, 124 KB)
- Bongard’s Creameries sludge reduction program (PDF, 124 KB)
- Central Bi-Products sludge reduction program (PDF, 127 KB)