Home > Products > Street and Parking Lot Maintenance

Street and Parking Lot Maintenance

Stay ahead of pavement failure, before a crack turns into a pothole.

More results...

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Subcategories

Tack Coat from Team Lab

T7 • Tack Coat

Anionic asphalt emulsion tack coat for patching, paving, and coating.
Tack Coat & Joint Sealer from Team Lab

T7A • Tack Coat & Joint Sealer

Canned tack coat and joint sealer that replaces drums and barrels.
Team Lab T9 rubberized crack filler

T9 • Crack Sealer

Rubberized, cold-applied anionic crack sealant for cracks up to 1/2″ wide.
Team Lab product image coming soon

T9A • Crackfilling Squeegee

Hand squeegee for striking off crack filler where a wheeled pot cannot reach.
Team Lab product image coming soon

T9B • Squeegee Replacement Blades

Replacement blades for the crack-filling squeegee.
Team Lab tar pot crack filling applicator

T9C • Tar Pot, Round

The round tar pot on its own, for hot or cold pour crack filler.
Team Lab product image coming soon

T9D • Tar Pot & Cart

Wheeled tar pot with spring-loaded squeegee, for hot or cold pour crack filling.
Team Lab product image coming soon

T9SC • Easy Spray Seal Machine, Complete

Gas-powered machine that pumps and applies cold pour crack fillers from pails and drums.
All Weather Road Patch from Team Lab

T11F • All Weather Road Patch

All-weather pothole patch for asphalt or concrete. No mixing required.

How pavement fails, and how to stay ahead

Water is what turns a crack into a pothole

Cracks let water into the base. Water plus freeze-thaw lifts and breaks the pavement, and the crack becomes a pothole. Sealing early is the cheapest mile of road you will ever buy.
screen

Seal cracks before they spread

A sealed crack keeps water out of the base, which is the single most cost-effective preventative maintenance step on any asphalt surface. Waiting until potholes form multiplies the repair cost.

Hot-pour vs cold-pour

Hot-pour rubberized sealant gives the longest-lasting, most flexible seal and suits larger programs with a melter. Cold-pour fillers are simpler and faster for small crews and low volumes.

Striping that holds

Surface prep and the right paint system decide how long lines last. A clean, primed surface and a quality waterborne paint cut how often you re-stripe.
Why public works crews work with Team Lab

Built for the freeze-thaw that breaks Upper Midwest roads

We formulate and supply pavement products for the climate they actually sit in, and we help you sequence the work so the budget goes further.

Climate-tested

Sealants and patch that stay flexible and bonded through hard freeze-thaw cycles, where a brittle product fails in one winter.

Lower lifetime cost

Preventative crack sealing and durable striping mean fewer full repairs and fewer re-stripes, which is where the savings actually are.

Right product for the crew

Hot-pour or cold-pour, bulk or aerosol, matched to your equipment and volume.

FAQS

Street and Parking Lot Maintenance - common questions

What crack width should I seal versus rout first?

Narrow working cracks take sealant directly. Wider or raveled cracks may need routing first for a clean reservoir. Your rep can help you set a threshold for your roads.

Most sealing is done in dry, moderate conditions when cracks are at a mid-range width. Very cold or wet conditions hurt adhesion. We can advise the window for your product.

Quality cold patch is built to open to traffic almost immediately, which is why it is the standard for fast public works repairs.

Building your maintenance plan? We will spec it with you.

Talk to the territory rep for your state. Tell them what you are working on and they will point you to the right product.

Scroll to Top